Projects Implemented:
The following are projects that have been successfully implemented by AHE. They are being provided with support and maintenance services as needed.
Executed Power Plants:
- Beach Minerals Company Private Limited, Tirunelveli dist, Tamilnadu. - For Captive Power Usage
Beach Minerals Company Private Limited is a 1.5 MW (2 X 850 Kg/ Hr) gasifier based captive power plant for their own consumption in their manufacturing unit.
|
Plant commissioned : March '07
Gasifier A running hrs : More than 10200 hrs
Gasifier B running hrs : More than 9100 hrs
Total Power generated : 95, 00,000 units
Total Engine hrs : More than 7000 hrs
Plant availability : More than 90%
|
 |
- Pointec Writing Instruments Private Limited, Hosur, Tamilnadu. - For Captive Power Usage
Pointec Writing Instruments Private Limited is a 250 KW (300 Kg/ Hr) Captive power plant to generate power for their own consumption in their manufacturing unit.
Plant started during the year 2008
Plant has crossed more than 3000 Hrs
|
 |
- Beach Minerals Company Private Limited, Tirunelveli dist, Tamilnadu. - Additional Gasifier for Captive Power Usage
|
Beach Minerals Company Private Limited is a 1 X 850 Kg/ Hr additional gasifier for their captive power plant in their plant.
|
|
Executed Thermal Plants:
- Kandasamy Metal Rolling Mill Private Limited, Palakkad, Kerala. - For Aluminium Melting Application
First gasifier for aluminium melting application on hot gas mode
Kandasamy metals, Palakkad is a 1x100 kg/hr thermal plant on hot gas mode For Aluminium melting application and the first kind of installation with a direct hot gas mode. The highlight is that it is highly cost effective with a low running cost. Return on Investment has already been achieved.
|
Plant commissioned : April '07
Plant running hrs : 5000 hrs crossed.
Daily operations : 12 hrs/ day
|
 |
Production level has been increased from 8 pans/day to 12 pans/day with same duration and biomass of 1300 -1400 kgs/day (ie from 1.6MT of Al to 2.4 MT of Al)
FO saved till date : More than 1, 25,000 liters
Aluminium melted : Around 800 MT
Return on Investment achieved
- Beach Minerals Company Private Limited, Tirunelveli, Tamilnadu. - For Fluidized bed Mineral drying application
This is a 600 KW (1 X 200 Kg/Hr) thermal plant on hot gas mode for fluidised bed mineral drying application. It has successfully achieved fluidised bed drier operating pressure more than 750 mmwc. The gasifier system had been designed to overcome the drier pressure and pumped the necessary flow of gas for firing. The plant is currently being operated successfully with 100% diesel replacement and the same product output.
|
Plant commissioned : April '08
Plant running hrs : 4500 hrs crossed.
Daily operations : 24 hrs/day
Diesel replacement : 40-80 liters/hr
Fuel Saved : 2, 25, 000 Liters
|
 |
Plant has been running very successfully. 100% diesel is replaced in the system.
- Beach Minerals Company Private Limited, Tuticorin, Tamilnadu. - For Rotary Kiln Mineral drying application
This is a 1200 KW (1 X 400 Kg/Hr) thermal plant on hot gas mode for rotary kiln for mineral drying application. This has made huge fuel savings with about 2400 liters/day diesel saved every day continuously. The plant operation is efficient an produces the same product output. What makes this even more attractive is that biomass consumption level is only 200–250 kg/hr maximum to replace the 100 lit/hr diesel operation. 100% diesel has been replaced in the system.
|
Plant commissioned : January'08
Plant running hrs : 4000 hrs crossed.
Daily operations : 24 hrs/day
Diesel replacement : 80-100 liters/hr
Fuel Saved : 4, 00, 000 Liters
|
Plant has been running very successfully. 100% diesel is replaced in the system.
- Acclaim Technology Services, Chennai, Tamilnadu. - for Drying application
For drying application
This is a 1050 KW (1 X 350 Kg/ Hr) thermal plant on hot gas mode for mineral drying in their manufacturing unit.
|
Plant commissioned : April '08
Plant running hrs : More than 1750 Hrs
Daily operations : 24 hrs/day
Diesel replacement : 80-100 liters/hr
Fuel Saved : More than 1,20,000 liters
|
 |
Plant has been running very successfully. 100% diesel is replaced in the system.
- Amrita Institute of Medical Science, Cochin, Kerala. - For Cooking & Boiler application
First gasifier for cooking application on hot gas mode
Amrita Institute of Medical Science & Research Center, Cochin is a 250 Kg/ Hr thermal plant on hot gas mode for cooking purpose in their canteen. This is the first kind of plant on hot gas mode installed for cooking purpose and boiler application.
|
Plant commissioned : Feb '09
Plant running hrs : 4000 hrs crossed.
Daily operations : 10–12 hrs/day
Total No of burners installed : 13 Burners
Total no. of burners under implementation : 5 Burners
Fuel replacement : 200 Kg of LPG Per
Day & 400 liters of
Diesel Per Day
Fuel Saved : 1, 30,000 Liters
|
 |
- ITC Ltd, Vellakovil, Tamilnadu. -Biscuit Baking Application
This is a 1800 KW (600 Kg/ Hr) thermal gasifier to replace about 150 liters of FO/Hr through indirect Heating, upto 270–325 ° C for biscuit baking.
|
 |
- Godrej & Boyce Mfg Co Ltd, Shirwal, Maharashtra. - For Drying application in powder coating industry
|
This is a 1200 KW (400 Kg/ Hr) thermal gasifier to replace about 100 liters of Diesel/Hr through indirect Heating, 200 & 100 deg C for paint & water drying application in their powder coating industry.
|
 |
- Godrej & Boyce Mfg Co Ltd, Mohali, Punjab. - For Drying application in powder coating industry
This is a 1200 KW (400 Kg/ Hr) thermal gasifier to replace about 100 KG of LPG/Hr through indirect Heating, 200 & 100 deg C for paint & water drying application in their powder coating industry.
|
 |
- Olivellam, Srilanka. - For Tea leaf drying Application.
This is a 360 KW (120 Kg/ Hr) thermal gasifier for their heat requirement of 3, 60,000 Kcal/Hr through Direct Heating for their tea drying application.
|
 |
- Karur K.C.P Packaging Ltd, Karur, Tamilnadu. - For Cooking Application
|
This is a 100 KW (35 Kg/ Hr) thermal gasifier to replace about 9-10 Kg of LPG/Hr in their canteen for cooking application.
|
 |
Power Plant Under Implementation:
- Sri Sasthaa Energy Private Limited, Chennai, Tamilnadu. - Grid Connected Power Plant
|
This is a 600 KW Grid Linked (1 X 750 Kg/ hr Gasifier) to supply power to TNEB.
|
 |
Thermal Plants Under Implementation:
- Balamurugan Chemical Private Limited, Tuticorin, Tamilnadu. - For Titanium di Oxide Manufacturing
This is 8000 KW (2 X 1600 Kg/ Hr) thermal gasifier to replace about 800 liters of FO/Hr through direct Heating, upto 1250 deg C for their Titanium di Oxide (TiO2) industry
|
 |
- Sonaly Industries, Coimbatore, Tamilnadu. - for Aluminium Extrusion Application.
This is a 2250 KW (750 Kg/ Hr) thermal gasifier to replace about 180 liters of FO/Hr through indirect Heating, upto 200 - 500 deg C deg for their Aluminium Extruction industry.
|
|
|
|